Quick Project Snapshot
Location: | Rajouri Garden New Delhi |
System Size: | 4.905 kWp |
Installed On: | 18 Jan 2025 |
Inverter Brand: | Luminous |
Panels Used: | Vikram Solar (Mono PERC) |
Type: | Residential (Net Metered) |
Subsidy Received: | ₹ 78,000 (Delhi Solar Subsidy & GBI) |
Project Overview
- Location: Rajouri Garden New Delhi
- System Capacity: 4.905 kWp
- Date of Commissioning: 18 Jan 2025
- Solar Modules: Vikram Solar (Mono PERC) – High-efficiency panels with industry-leading warranties
- Inverter: Luminous – String inverter optimized for residential grid-tied applications
- Mounting Structure: Hot-dip galvanized MS structure with wind load compliance as per IS standards
- Net Metering: Enabled, synchronized with Uttar Pradesh Power Corporation grid
- Subsidy Sanctioned: ₹ 78,000 under the state rooftop subsidy scheme
- Expected Annual Generation: Approx. 9,800-10,200 kWh
- Estimated Carbon Offset: ~9.2 metric tons of CO₂ per year
Installation
Following comprehensive rooftop feasibility and load profiling, Exolar engineered a custom 4.905 kWp grid-tied system optimizing efficiency within local policy.
- Optimized module layout reducing shading using PVsyst.
- Balanced two-string configuration ensuring MPPT efficiency.
- Conforms to MNRE & UPNEDA standards; includes protection & earthing.
- Real-time monitoring system for performance and alerts.
Client Benefits
- Reduced grid dependency & significant bill savings.
- Expected 4.5-5 years payback post subsidy.
- Carbon offset equal to over 400 trees planted annually.
- 25-year panel & 5-year inverter warranty.
Conclusion
This project highlights Exolar’s commitment delivering reliable, economic, and environmentally sustainable solar solutions, serving as a model for Uttar Pradesh urban households.
Google
★★★★★
“We got 5 KVA solar installed from Exolar, initially we were skeptical on the supplier to be finalised for this bcoz this solar installation passes through multiple process.
After getting the quotation and price finalization we gained confidence and proceeded with them. We were quite satisfied with the way they handled the whole thing, They have good team members who take care of each phase and answer your queries as when it arises.
Once we made the final payment, they had sent a staff to clean the panels and that is when we also learnt it how to practically clean it at regular frequency.
Over all the project was expected to end in 3 months to 4 months period but in our case it took little more i think 5 months or so, bcoz these guys from desu took extra time to come, plus we had to get over load thing installed , which was not there – here talking about ELCB…
They also filed government scheme on solar panel rebate thing and we got back the amount after i think 4 months, which is ok, we were expecting some delay there.. Over all our experience with this company was good.”
Thank you so much for the solar installation process. Delivered quality service & optimal system performance. Highly recommend.
Project Video
Project Images